<br />
<b>Notice</b>:  Function _load_textdomain_just_in_time was called <strong>incorrectly</strong>. Translation loading for the <code>wpdatatables</code> domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the <code>init</code> action or later. Please see <a href="https://developer.wordpress.org/advanced-administration/debug/debug-wordpress/">Debugging in WordPress</a> for more information. (This message was added in version 6.7.0.) in <b>/home/jz5l0vmaenpx/public_html/new2026/wp-includes/functions.php</b> on line <b>6131</b><br />
{"id":6362,"date":"2022-07-29T04:46:08","date_gmt":"2022-07-29T09:46:08","guid":{"rendered":"https:\/\/northeastfloridatraffic.com\/new2026\/?p=6362"},"modified":"2023-03-29T20:52:28","modified_gmt":"2023-03-30T01:52:28","slug":"heckscher-drives-simpson-creek-bridge-traffic-shift","status":"publish","type":"post","link":"https:\/\/northeastfloridatraffic.com\/new2026\/news\/heckscher-drives-simpson-creek-bridge-traffic-shift\/","title":{"rendered":"Heckscher Drive\u2019s Simpson Creek Bridge Traffic Shift &#8211; (Completed August 1, 2022)"},"content":{"rendered":"<p class=\"x_MsoNormal\"><b>JACKSONVILLE, Fla.<\/b>\u00a0\u2013\u00a0Reconstruction of the first phase of the Simpson Creek Bridge on Heckscher Drive (State Road A1A) is scheduled for completion the week of August 1. When completed, traffic will be shifted to the new structure while reconstruction of the last phase of the bridge begins.<\/p>\n<p class=\"x_MsoNormal\">Temporary traffic signals with video detection are being utilized on both ends of the bridge to maintain traffic, including bicycles, in a two-way, one-lane configuration while bridge reconstruction occurs.<\/p>\n<p class=\"x_MsoNormal\">The replacement of the Simpson Creek Bridge is part of the Timucuan Trail project currently under construction on the east side of Heckscher Drive. Once completed, the new bridge will provide two 12-foot travel lanes, two 10-foot shoulders and the 10-foot wide Timucuan Trail. The reconstruction of the Myrtle Creek Bridge, south of Simpson Creek, was completed in November 2021.<\/p>\n<p class=\"x_MsoNormal\">The Timucuan Trail is a shared use bike and walking path that will connect to the existing trail at the Little Talbot Island State Park entrance and extend to the Big Talbot Island State Park Big Pine Trailhead north of Houston Avenue.<\/p>\n<p class=\"x_MsoNormal\">Stay informed about lane closures and roadwork in your area by following FDOT District 2 at\u00a0<a title=\"Original URL: https:\/\/twitter.com\/MyFDOT_NEFL. Click or tap if you trust this link.\" href=\"https:\/\/nam04.safelinks.protection.outlook.com\/?url=https%3A%2F%2Ftwitter.com%2FMyFDOT_NEFL&amp;data=05%7C01%7Csherri.byrd%40metriceng.com%7Ca78273fa5c044db761a708da70c5b0df%7C785e3720537e4b60a99519d9c7bf39dc%7C1%7C0%7C637946291641818212%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&amp;sdata=BiprHNTvbv4n9PhxJkg21oc0ZQla0eueJho072iYH7U%3D&amp;reserved=0\" target=\"_blank\" rel=\"noopener noreferrer\" data-auth=\"Verified\" data-linkindex=\"1\">@MyFDOT_NEFL<\/a>\u00a0on Twitter, at\u00a0<a title=\"Original URL: https:\/\/www.facebook.com\/MyFDOTNEFL. Click or tap if you trust this link.\" href=\"https:\/\/nam04.safelinks.protection.outlook.com\/?url=https%3A%2F%2Fwww.facebook.com%2FMyFDOTNEFL&amp;data=05%7C01%7Csherri.byrd%40metriceng.com%7Ca78273fa5c044db761a708da70c5b0df%7C785e3720537e4b60a99519d9c7bf39dc%7C1%7C0%7C637946291641818212%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&amp;sdata=J5zSAPsTNk%2Bhbd5wPdZ8L4QFMWMYB%2Fb%2BQ3QuthF67Gc%3D&amp;reserved=0\" target=\"_blank\" rel=\"noopener noreferrer\" data-auth=\"Verified\" data-linkindex=\"2\">MyFDOTNEFL<\/a>\u00a0on Facebook or by visiting\u00a0<a title=\"Original URL: http:\/\/www.nflroads.com\/. Click or tap if you trust this link.\" href=\"https:\/\/nam04.safelinks.protection.outlook.com\/?url=http%3A%2F%2Fwww.nflroads.com%2F&amp;data=05%7C01%7Csherri.byrd%40metriceng.com%7Ca78273fa5c044db761a708da70c5b0df%7C785e3720537e4b60a99519d9c7bf39dc%7C1%7C0%7C637946291641818212%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&amp;sdata=NkHLqCKXGOC1Rvkeo2CGBYonvteS7gT84e3m%2BeNHtDg%3D&amp;reserved=0\" target=\"_blank\" rel=\"noopener noreferrer\" data-auth=\"Verified\" data-linkindex=\"3\">nflroads.com<\/a>.<\/p>\n<p><i>Drivers should continue to expect two-way, one-lane traffic utilizing temporary traffic signals during construction.<\/i><\/p>\n","protected":false},"excerpt":{"rendered":"<p>JACKSONVILLE, Fla.\u00a0\u2013\u00a0Reconstruction of the first phase of the Simpson Creek Bridge on Heckscher Drive (State Road A1A) is scheduled for completion the week of August 1. When completed, traffic will be shifted to the new structure while reconstruction of the last phase of the bridge begins. Temporary traffic signals with video detection are being utilized&hellip;<\/p>\n","protected":false},"author":18,"featured_media":6363,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[41],"tags":[],"class_list":["post-6362","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","category-41","description-off"],"_links":{"self":[{"href":"https:\/\/northeastfloridatraffic.com\/new2026\/wp-json\/wp\/v2\/posts\/6362","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/northeastfloridatraffic.com\/new2026\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/northeastfloridatraffic.com\/new2026\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/northeastfloridatraffic.com\/new2026\/wp-json\/wp\/v2\/users\/18"}],"replies":[{"embeddable":true,"href":"https:\/\/northeastfloridatraffic.com\/new2026\/wp-json\/wp\/v2\/comments?post=6362"}],"version-history":[{"count":3,"href":"https:\/\/northeastfloridatraffic.com\/new2026\/wp-json\/wp\/v2\/posts\/6362\/revisions"}],"predecessor-version":[{"id":6428,"href":"https:\/\/northeastfloridatraffic.com\/new2026\/wp-json\/wp\/v2\/posts\/6362\/revisions\/6428"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/northeastfloridatraffic.com\/new2026\/wp-json\/wp\/v2\/media\/6363"}],"wp:attachment":[{"href":"https:\/\/northeastfloridatraffic.com\/new2026\/wp-json\/wp\/v2\/media?parent=6362"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/northeastfloridatraffic.com\/new2026\/wp-json\/wp\/v2\/categories?post=6362"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/northeastfloridatraffic.com\/new2026\/wp-json\/wp\/v2\/tags?post=6362"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}