<br />
<b>Notice</b>:  Function _load_textdomain_just_in_time was called <strong>incorrectly</strong>. Translation loading for the <code>wpdatatables</code> domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the <code>init</code> action or later. Please see <a href="https://developer.wordpress.org/advanced-administration/debug/debug-wordpress/">Debugging in WordPress</a> for more information. (This message was added in version 6.7.0.) in <b>/home/jz5l0vmaenpx/public_html/new2026/wp-includes/functions.php</b> on line <b>6131</b><br />
{"id":6579,"date":"2023-02-03T06:00:12","date_gmt":"2023-02-03T11:00:12","guid":{"rendered":"https:\/\/northeastfloridatraffic.com\/new2026\/?p=6579"},"modified":"2023-03-29T20:51:43","modified_gmt":"2023-03-30T01:51:43","slug":"i-10-west-exit-to-roosevelt-boulevard-detour-planned-for-this-weekend-mcduff-avenue-and-post-street-will-also-see-closures","status":"publish","type":"post","link":"https:\/\/northeastfloridatraffic.com\/new2026\/news\/i-10-west-exit-to-roosevelt-boulevard-detour-planned-for-this-weekend-mcduff-avenue-and-post-street-will-also-see-closures\/","title":{"rendered":"I-10 West Exit to Roosevelt Boulevard Detour Planned &#8211; McDuff Avenue and Post Street Will Also See Closures &#8211; (Completed February 5, 2023)"},"content":{"rendered":"<p class=\"x_MsoNormal\"><b>JACKSONVILLE, Fla.<\/b>\u00a0\u2013 As part of FDOT\u2019s I-10 from I-295 to I-95 widening project, the I-10 west exit to Roosevelt Boulevard (U.S. 17) will be detoured Saturday, Feb. 4 and Sunday, Feb. 5 from 5 a.m. to 8 p.m. while crews perform bridge construction activities, weather and unforeseen circumstances permitting.<\/p>\n<p class=\"x_MsoNormal\">Drivers who wish to take the Roosevelt Boulevard (U.S. 17) exit will be detoured to the McDuff Avenue exit and left on McDuff to reconnect with U.S. 17.<\/p>\n<p class=\"x_MsoNormal\">To better facilitate the increased flow of traffic along McDuff Avenue resulting from the Roosevelt Boulevard detour, northbound McDuff Avenue will be closed at the U.S. 17 intersection, southbound McDuff Avenue will be closed at Lenox Avenue, the eastbound I-10 exit to McDuff Avenue will be closed, both directions of Old Roosevelt Boulevard will be closed at McDuff Avenue and both directions of Post Street will be closed at McDuff Avenue.<\/p>\n<p class=\"x_MsoNormal\">Stay informed about lane closures and roadwork in your area by following FDOT District 2 at\u00a0<a title=\"Original URL: https:\/\/twitter.com\/MyFDOT_NEFL. Click or tap if you trust this link.\" href=\"https:\/\/nam04.safelinks.protection.outlook.com\/?url=https%3A%2F%2Ftwitter.com%2FMyFDOT_NEFL&amp;data=05%7C01%7Csherri.byrd%40metriceng.com%7Ceabd0a80845449d6e19a08db04900ee8%7C785e3720537e4b60a99519d9c7bf39dc%7C1%7C0%7C638108789003375507%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&amp;sdata=5XhtIIZBRef68Q7fqM7zaWw%2FaFFjlKM160Q7%2BEgWrw4%3D&amp;reserved=0\" target=\"_blank\" rel=\"noopener noreferrer\" data-auth=\"Verified\" data-linkindex=\"1\">@MyFDOT_NEFL<\/a>\u00a0on Twitter, at\u00a0<a title=\"Original URL: https:\/\/www.facebook.com\/MyFDOTNEFL. Click or tap if you trust this link.\" href=\"https:\/\/nam04.safelinks.protection.outlook.com\/?url=https%3A%2F%2Fwww.facebook.com%2FMyFDOTNEFL&amp;data=05%7C01%7Csherri.byrd%40metriceng.com%7Ceabd0a80845449d6e19a08db04900ee8%7C785e3720537e4b60a99519d9c7bf39dc%7C1%7C0%7C638108789003375507%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&amp;sdata=iSNFOg%2BH%2BbNe5HoGbhFl50L%2F7xKA01XK1BT2keo8CS8%3D&amp;reserved=0\" target=\"_blank\" rel=\"noopener noreferrer\" data-auth=\"Verified\" data-linkindex=\"2\">MyFDOTNEFL<\/a>\u00a0on Facebook or by visiting nflroads.com.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>JACKSONVILLE, Fla.\u00a0\u2013 As part of FDOT\u2019s I-10 from I-295 to I-95 widening project, the I-10 west exit to Roosevelt Boulevard (U.S. 17) will be detoured Saturday, Feb. 4 and Sunday, Feb. 5 from 5 a.m. to 8 p.m. while crews perform bridge construction activities, weather and unforeseen circumstances permitting. Drivers who wish to take the&hellip;<\/p>\n","protected":false},"author":18,"featured_media":6580,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[41],"tags":[],"class_list":["post-6579","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","category-41","description-off"],"_links":{"self":[{"href":"https:\/\/northeastfloridatraffic.com\/new2026\/wp-json\/wp\/v2\/posts\/6579","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/northeastfloridatraffic.com\/new2026\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/northeastfloridatraffic.com\/new2026\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/northeastfloridatraffic.com\/new2026\/wp-json\/wp\/v2\/users\/18"}],"replies":[{"embeddable":true,"href":"https:\/\/northeastfloridatraffic.com\/new2026\/wp-json\/wp\/v2\/comments?post=6579"}],"version-history":[{"count":3,"href":"https:\/\/northeastfloridatraffic.com\/new2026\/wp-json\/wp\/v2\/posts\/6579\/revisions"}],"predecessor-version":[{"id":6592,"href":"https:\/\/northeastfloridatraffic.com\/new2026\/wp-json\/wp\/v2\/posts\/6579\/revisions\/6592"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/northeastfloridatraffic.com\/new2026\/wp-json\/wp\/v2\/media\/6580"}],"wp:attachment":[{"href":"https:\/\/northeastfloridatraffic.com\/new2026\/wp-json\/wp\/v2\/media?parent=6579"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/northeastfloridatraffic.com\/new2026\/wp-json\/wp\/v2\/categories?post=6579"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/northeastfloridatraffic.com\/new2026\/wp-json\/wp\/v2\/tags?post=6579"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}