<br />
<b>Notice</b>:  Function _load_textdomain_just_in_time was called <strong>incorrectly</strong>. Translation loading for the <code>wpdatatables</code> domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the <code>init</code> action or later. Please see <a href="https://developer.wordpress.org/advanced-administration/debug/debug-wordpress/">Debugging in WordPress</a> for more information. (This message was added in version 6.7.0.) in <b>/home/jz5l0vmaenpx/public_html/new2026/wp-includes/functions.php</b> on line <b>6131</b><br />
{"id":7273,"date":"2024-04-23T04:41:05","date_gmt":"2024-04-23T09:41:05","guid":{"rendered":"https:\/\/northeastfloridatraffic.com\/new2026\/?p=7273"},"modified":"2024-04-25T04:34:39","modified_gmt":"2024-04-25T09:34:39","slug":"overnight-detours-planned-for-martin-luther-king-jr-parkway-sr-115-its-improvements","status":"publish","type":"post","link":"https:\/\/northeastfloridatraffic.com\/new2026\/news\/overnight-detours-planned-for-martin-luther-king-jr-parkway-sr-115-its-improvements\/","title":{"rendered":"Overnight Detours Planned for Martin Luther King Jr. Parkway (SR 115) ITS Improvements &#8211; (Completed April 25, 2024)"},"content":{"rendered":"<p class=\"x_MsoNormal\"><b>JACKSONVILLE, Fla. \u2013\u00a0<\/b>\u00a0As part of the Martin Luther King Jr. Parkway Intelligent Transportation System (ITS) improvements project on Martin Luther King Jr. Parkway (State Road 115) from Boulevard Street to Beach Boulevard, overnight detours are scheduled Tuesday, April 23 through Thursday, April 25 for installation of CCTV poles.<\/p>\n<p class=\"x_MsoNormal\"><b><u>MLK Parkway Northbound On-Ramp from University Boulevard Detour<\/u><\/b><\/p>\n<p class=\"x_MsoNormal\">The Martin Luther King Jr. Parkway on-ramp from University Boulevard will close nightly starting Tuesday, April 23 through Thursday, April 25 between 8 p.m. and 6 a.m. the following morning.<\/p>\n<p class=\"x_MsoNormal\">As a detour, drivers will continue north on University Boulevard and turn left onto the westbound MLK Parkway on-ramp.<\/p>\n<p class=\"x_MsoNormal\"><b><u>Eastbound Beach Boulevard at East Road Detour<\/u><\/b><\/p>\n<p class=\"x_MsoNormal\">Eastbound lanes of Beach Boulevard will close nightly starting Monday, April 23 through Thursday, April 25 between 8 p.m. and 6 a.m. the following morning.<\/p>\n<p class=\"x_MsoNormal\">As a detour, drivers will take Beach Boulevard eastbound, exit to East Road, turn left onto Parental Home Road\u00a0and turn right onto Beach Boulevard.<\/p>\n<p class=\"x_MsoNormal\">Stay informed about lane closures and roadwork in your area by following FDOT District 2 at\u00a0<a title=\"Original URL: https:\/\/twitter.com\/MyFDOT_NEFL. Click or tap if you trust this link.\" href=\"https:\/\/nam04.safelinks.protection.outlook.com\/?url=https%3A%2F%2Ftwitter.com%2FMyFDOT_NEFL&amp;data=05%7C02%7Csherri.byrd%40metriceng.com%7C1098cd4994f34f77a8c708dc60a27974%7C785e3720537e4b60a99519d9c7bf39dc%7C1%7C0%7C638491498148143120%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C0%7C%7C%7C&amp;sdata=t77feBXusmvHRx4EXBXf3DK1DwGDWUaeg0STGEpkSO4%3D&amp;reserved=0\" target=\"_blank\" rel=\"noopener noreferrer\" data-auth=\"Verified\" data-linkindex=\"1\">@MyFDOT_NEFL<\/a>\u00a0on X (formerly known as Twitter) or at\u00a0<a title=\"Original URL: https:\/\/www.facebook.com\/MyFDOTNEFL. Click or tap if you trust this link.\" href=\"https:\/\/nam04.safelinks.protection.outlook.com\/?url=https%3A%2F%2Fwww.facebook.com%2FMyFDOTNEFL&amp;data=05%7C02%7Csherri.byrd%40metriceng.com%7C1098cd4994f34f77a8c708dc60a27974%7C785e3720537e4b60a99519d9c7bf39dc%7C1%7C0%7C638491498148156079%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C0%7C%7C%7C&amp;sdata=%2FlZAETuRp6LKoO7vKfAtq1NK10EcsNx32Gmvs1%2FPXXw%3D&amp;reserved=0\" target=\"_blank\" rel=\"noopener noreferrer\" data-auth=\"Verified\" data-linkindex=\"2\">MyFDOTNEFL<\/a>\u00a0on Facebook.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>JACKSONVILLE, Fla. \u2013\u00a0\u00a0As part of the Martin Luther King Jr. Parkway Intelligent Transportation System (ITS) improvements project on Martin Luther King Jr. Parkway (State Road 115) from Boulevard Street to Beach Boulevard, overnight detours are scheduled Tuesday, April 23 through Thursday, April 25 for installation of CCTV poles. MLK Parkway Northbound On-Ramp from University Boulevard&hellip;<\/p>\n","protected":false},"author":18,"featured_media":7084,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[41],"tags":[],"class_list":["post-7273","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","category-41","description-off"],"_links":{"self":[{"href":"https:\/\/northeastfloridatraffic.com\/new2026\/wp-json\/wp\/v2\/posts\/7273","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/northeastfloridatraffic.com\/new2026\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/northeastfloridatraffic.com\/new2026\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/northeastfloridatraffic.com\/new2026\/wp-json\/wp\/v2\/users\/18"}],"replies":[{"embeddable":true,"href":"https:\/\/northeastfloridatraffic.com\/new2026\/wp-json\/wp\/v2\/comments?post=7273"}],"version-history":[{"count":2,"href":"https:\/\/northeastfloridatraffic.com\/new2026\/wp-json\/wp\/v2\/posts\/7273\/revisions"}],"predecessor-version":[{"id":7279,"href":"https:\/\/northeastfloridatraffic.com\/new2026\/wp-json\/wp\/v2\/posts\/7273\/revisions\/7279"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/northeastfloridatraffic.com\/new2026\/wp-json\/wp\/v2\/media\/7084"}],"wp:attachment":[{"href":"https:\/\/northeastfloridatraffic.com\/new2026\/wp-json\/wp\/v2\/media?parent=7273"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/northeastfloridatraffic.com\/new2026\/wp-json\/wp\/v2\/categories?post=7273"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/northeastfloridatraffic.com\/new2026\/wp-json\/wp\/v2\/tags?post=7273"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}