JACKSONVILLE, Fla. – Resurfacing work is scheduled to begin on State Road 202 (J. Turner Butler Boulevard) from Belfort Road to Hodges Boulevard next week. This project includes milling and resurfacing, base work, shoulder treatment, drainage improvements, highway signing, guardrail installation, bridge construction, and other incidental construction.
Traffic will be maintained in accordance with FDOT design standards throughout the project. No lane closures will be allowed from 6:30 a.m. to 8 p.m. Monday through Thursday Friday from 6:30 a.m. to 10 p.m., Saturday from 8 a.m. to 10 p.m., and Sunday from 8 a.m. to 8 p.m.
Preferred Materials is estimated to complete this project by late 2027, weather and unforeseen circumstances permitting.
Stay informed about lane closures and roadwork in your area by following FDOT District 2 at @MyFDOT_NEFL on X, at MyFDOTNEFL on Facebook or by visiting nflroads.com. Drivers seeking real-time traffic alerts may visit www.FL511.com or download the FL511 app.




