JACKSONVILLE, Fla. – As part of FDOT’s I-10 from I-295 to I-95 widening project, closures and detours are scheduled at multiple interchanges within the project limits while crews perform bridge construction operations, weather and unforeseen circumstances permitting.
Closures scheduled through Thursday, July 11 from 10 p.m. to 5 a.m. the following morning:
- I-10 West exit to U.S. 17 (Roosevelt Boulevard) closed: Drivers will detour to the McDuff Avenue exit and turn left on McDuff Avenue to connect with Roosevelt Boulevard.
- U.S. 17 to I-10 East on-ramp closed: Drivers will detour to Edgewood Avenue and take Plymouth Street to connect with I-10 East.
- Irene Street to I-10 West on-ramp closed: Drivers will detour to Edison Avenue and take Forest Street to connect with I-10 West.
- McDuff Avenue to I-10 West on-ramp closed: Northbound drivers will detour to Lenox Avenue and take Cassat Avenue to connect with I-10 West. Southbound drivers will take Rosselle Street, to Stockton Street, to Irene Street and take Forest Avenue to connect with I-10 West.
- McDuff Avenue to I-10 East on-ramp closed: Northbound drivers will detour to Edison Avenue, to Stockton Street and take Irene Street to connect with I-10 East. Southbound drivers will detour to Rosselle Street and take Stockton Street to connect with I-10 East.
- I-10 West exit to Luna Street: Drivers will detour to the Cassat Avenue exit and take Highway Avenue to connect with Luna Street.
Drivers seeking real-time traffic alerts are encouraged to visit www.FL511.com or download the FL511 app prior to their journey.